Fitchs Bridge (CLOSED)

3.1 mi · ▲ 0 ft · 1 hr 2 min

Fitchs Bridge (CLOSED) is a 3.1-mile out-and-back near Paper Mill Village, MA. It is mostly level, with 0 ft of elevation gain, and mostly dirt. It scores 0/100 on the Ambleway Wildness scale: paved and peopled.

Elevation

0 mi200 – 210 ft3.3 mi

Getting there

Trailhead: Unnamed 42.61586, -71.59474
Nearest town Paper Mill Village, MA

Directions

AMBLEWAYwww.ambleway.com

Fitchs Bridge (CLOSED)

3.1 mi · ▲ 0 ft · 1 hr 2 min

Elevation 199–211 ft

Out & Back

Trailhead: 42.61586, -71.59474

Weather Sep 20: Light rain, high 58°F / low 46° · precip 53% · wind 3 mph · sunrise 6:32 AM · sunset 6:49 PM

  1. Start at the trailhead, heading N.
  2. 0.5 miTurn right, heading NW.
  3. 450 ftTurn right, heading W.
  4. 0.3 miSharp left, heading N.
  5. 0.6 miTurn left onto Fitchs Bridge (CLOSED), heading N.
  6. 150 ftReach the turnaround, then head back the way you came.
  7. 150 ftTurn right, heading W.
  8. 0.6 miSharp right, heading NE.
  9. 0.3 miTurn left, heading SW.
  10. 450 ftTurn left, heading SE.
  11. 0.5 miArrive back at the trailhead.

Each distance is the walk from the previous step. Tap a step for a map of its junction.

Trail surface

94% dirt2% boardwalk4% unspecified

Weather

Light rainTemperature 58°F46°
Precip53%Wind3 mphUV1Humidity96%
Rained 0.1″ 3 days ago (0.9″ over the last week)
Hourly temperatureRain chance
60°45° 5 AM: 2% rain6 AM: 9% rain7 AM: 1% rain8 AM: 5% rain9 AM: 6% rain10 AM: 5% rain11 AM: 26% rain12 PM: 35% rain1 PM: 46% rain2 PM: 53% rain3 PM: 51% rain4 PM: 36% rain5 PM: 39% rain6 PM: 47% rain7 PM: 48% rain8 PM: 43% rain9 PM: 43% rain10 PM: 41% rain11 PM: 39% rain
Sunrise 6:32 AM12 AM3 AM9 AM12 PM3 PM9 PMSunset 6:49 PM
Mon 67°53° 32%
Tue 60°45°
Wed 62°43°
Thu 64°41°
Fri 63°47° 35%
Sat 60°51° 38%

Other ways to reach this destination