Bashakill Wildlife Management Area

Rail-Trail Spring via Mamakating O&W Rail Trail

1.9 mi · ▲ 0 ft · 38 min

Rail-Trail Spring via Mamakating O&W Rail Trail is a 1.9-mile out-and-back in Bashakill Wildlife Management Area near Westbrookville, NY. The route reaches Rail-Trail Spring at the turnaround, 0.9 miles in. It is mostly level, with 0 ft of elevation gain, and mostly dirt. It scores 33/100 on the Ambleway Wildness scale: green fringe.

Elevation

0 mi499 – 512 ft1.9 mi

Getting there

Trailhead: Mamakating O&W Rail Trail 41.51667, -74.53799
Nearest town Westbrookville, NY

Directions

AMBLEWAYwww.ambleway.com

Rail-Trail Spring via Mamakating O&W Rail Trail

1.9 mi · ▲ 0 ft · 38 min

Elevation 500–512 ft

Out & Back · Bashakill Wildlife Management Area

Trailhead: Mamakating O&W Rail Trail · 41.51667, -74.53799

Weather Sep 7: sunrise 6:31 AM · sunset 7:23 PM

Bikes allowed on the whole route · Dogs allowed on leash · Toilets at the trailhead · Drinking water at the trailhead · Parking lot at the trailhead

  1. Start on Mamakating O&W Rail Trail, heading SW.
  2. 0.9 miReach Rail-Trail Spring, then turn around and head back the way you came.
  3. 0.9 miArrive back at the trailhead.

Each distance is the walk from the previous step. Tap a step for a map of its junction.

Trail surface

100% dirt

Weather

Sunrise 6:31 AMSunset 7:23 PM

Good to know

  • Bikes allowed on the whole route
  • Dogs allowed on leash
  • Toilets at the trailhead
  • Drinking water at the trailhead
  • Parking lot at the trailhead