Fitchs Bridge (CLOSED)

2.4 mi · ▲ 0 ft · 48 min

Fitchs Bridge (CLOSED) is a 2.4-mile out-and-back near Paper Mill Village, MA. It is mostly level, with 0 ft of elevation gain, and mostly dirt. It scores 0/100 on the Ambleway Wildness scale: paved and peopled.

Elevation

0 mi200 – 203 ft2.5 mi

Getting there

Trailhead: Unnamed 42.61977, -71.60348
Nearest town Paper Mill Village, MA

Directions

AMBLEWAYwww.ambleway.com

Fitchs Bridge (CLOSED)

2.4 mi · ▲ 0 ft · 48 min

Elevation 199–202 ft

Out & Back

Trailhead: 42.61977, -71.60348

Weather Sep 21: sunrise 6:33 AM · sunset 6:47 PM

  1. Start at the trailhead, heading SE.
  2. 0.1 miSharp left, heading N.
  3. 100 ftTurn left, heading NW.
  4. 0.1 miBear right, heading N.
  5. 0.3 miSharp left, heading SW.
  6. 0.6 miTurn left onto Fitchs Bridge (CLOSED), heading W.
  7. 150 ftReach the turnaround, then head back the way you came.
  8. 150 ftTurn right, heading W.
  9. 0.6 miSharp right, heading NE.
  10. 0.3 miBear left, heading S.
  11. 0.1 miTurn right, heading S.
  12. 100 ftSharp right, heading SE.
  13. 0.1 miArrive back at the trailhead.

Each distance is the walk from the previous step. Tap a step for a map of its junction.

Trail surface

92% dirt3% boardwalk5% unspecified

Weather

Sunrise 6:33 AMSunset 6:47 PM

Other ways to reach this destination