Fitchs Bridge (CLOSED)

3.6 mi · ▲ 0 ft · 1 hr 12 min

Fitchs Bridge (CLOSED) is a 3.6-mile out-and-back near Paper Mill Village, MA. It is mostly level, with 0 ft of elevation gain, and mostly dirt. It scores 0/100 on the Ambleway Wildness scale: paved and peopled.

Elevation

0 mi200 – 213 ft3.8 mi

Getting there

Trailhead: Unnamed 42.61995, -71.58970
Nearest town Paper Mill Village, MA

Directions

AMBLEWAYwww.ambleway.com

Fitchs Bridge (CLOSED)

3.6 mi · ▲ 0 ft · 1 hr 12 min

Elevation 199–215 ft

Out & Back

Trailhead: 42.61995, -71.58970

Weather Aug 4: sunrise 5:42 AM · sunset 8:05 PM

  1. Start at the trailhead, heading S.
  2. 0.3 miTurn left, heading SW.
  3. 450 ftTurn right, heading NW.
  4. 0.4 miTurn right, heading W.
  5. 450 ftTurn right, heading NW.
  6. 0.3 miSharp left, heading N.
  7. 0.6 miTurn left onto Fitchs Bridge (CLOSED), heading N.
  8. 150 ftReach the turnaround, then head back the way you came.
  9. 150 ftTurn right, heading W.
  10. 0.6 miSharp right, heading NE.
  11. 0.3 miTurn left, heading SW.
  12. 450 ftTurn left, heading E.
  13. 0.4 miTurn left, heading SE.
  14. 450 ftTurn right, heading SE.
  15. 0.2 miArrive back at the trailhead.

Each distance is the walk from the previous step. Tap a step for a map of its junction.

Trail surface

95% dirt2% boardwalk3% unspecified

Weather

Sunrise 5:42 AMSunset 8:05 PM

Other ways to reach this destination