Fitchs Bridge (CLOSED)

3.4 mi · ▲ 0 ft · 1 hr 8 min

Fitchs Bridge (CLOSED) is a 3.4-mile out-and-back near Paper Mill Village, MA. It is mostly level, with 0 ft of elevation gain, and mostly dirt. It scores 0/100 on the Ambleway Wildness scale: paved and peopled.

Elevation

0 mi200 – 210 ft3.7 mi

Getting there

Trailhead: Unnamed 42.62069, -71.59423
Nearest town Paper Mill Village, MA

Directions

AMBLEWAYwww.ambleway.com

Fitchs Bridge (CLOSED)

3.4 mi · ▲ 0 ft · 1 hr 8 min

Elevation 199–211 ft

Out & Back

Trailhead: 42.62069, -71.59423

Weather Aug 4: sunrise 5:42 AM · sunset 8:05 PM

  1. Start at the trailhead, heading SW.
  2. 0.3 miTurn right, heading SW.
  3. 0.4 miTurn right, heading W.
  4. 450 ftTurn right, heading NW.
  5. 0.3 miSharp left, heading NE.
  6. 0.6 miTurn left onto Fitchs Bridge (CLOSED), heading NW.
  7. 150 ftReach the turnaround, then head back the way you came.
  8. 150 ftTurn right, heading N.
  9. 0.6 miSharp right, heading NE.
  10. 0.3 miTurn left, heading SW.
  11. 450 ftTurn left, heading S.
  12. 0.4 miTurn left, heading S.
  13. 0.2 miArrive back at the trailhead.

Each distance is the walk from the previous step. Tap a step for a map of its junction.

Trail surface

94% dirt2% boardwalk4% unspecified

Weather

Sunrise 5:42 AMSunset 8:05 PM

Other ways to reach this destination

More from this trailhead